Industrial Training - The Best for Less

Lean Maintenance using Six Sigma DMAIC

  1. Home >
  2. articles >
  3. archived >
  4. lean six sigma dmaic


(Maximize your equipment maintenance reliability - within 30 Days!)

Do you know how to get the near 100% uptime required before combining new and 30—or 40-year-old machines into Lean Manufacturing lines? Or will "maintenance" become the "tail that wags your dog"—your Achilles heel?

 

A Barrier To Lean
To compete in today's global economy and to increase profits, many factories are moving to "Lean Manufacturing," the next step beyond "Just In Time." Others claim "Lean" but hedge on the concept with hidden WIP inventories because they fear what they've seen in the past, when critical path machines go down for a "maintenance break." Other managers simply budget for and bolster their maintenance department with people, training, equipment and spare parts so they can more quickly "put out the fires" when downtime occurs. Others increase the budget (expense) to assign maintenance responsibility to outside subcontractors. Outside service vendors may or may not service you better, but its sure nice to be able to point the finger outside when downtime cripples production. But, it's still your downtime.

 

The Maintenance Problem
The underlying problem is Equipment reliability and uptime (some call it maintenance reliability). The solution is to find ways to eliminate unscheduled equipment downtime. The problem with downtime is that most maintenance people think, "It just happens. Then we fix it." The problem with downtime is, "You can monitor it, measure it, log it, report it, track it, attack it, or delegate it, but downtime will not go away until you "Eliminate it" - prevent it from happening in the first place.

 

A Solution (Lean Maintenance)

What? How does one "fix a machine so it doesn't break down again"?

 

Answer: To prevent downtime from happening before it occurs, you must eliminate the basic stresses that cause the downtime.

 

A methodology is needed to protect computers, automation controllers, PLCs, CNC machines, etc. And protect their electronic and hydraulic control systems from the stresses that cause malfunctions and failures. The author has been applying this methodology and perfecting it since 1977. He calls it "Lean Maintenance for Lean Manufacturing." This practical and most cost-effective methodology can help almost any facility, from data centers to telecom to medical, from semiconductor manufacturing to plastics & metal manufacturing. Within 30 - 60 days, you can thus avoid malfunctions, failures, unscheduled downtime, scrap parts, re-work, missing delivery schedules, etc. And get the near 100% reliability, repeatability, yield, and uptime needed to increase profits.

 

Improved uptime is also needed as companies push to lower costs by shedding:

  1. Onsite spare parts
  2. Onsite board or component repair, and
  3. Onsite technicians, maintenance engineers, etc.

 

The few skilled technicians need to be updated. In 3 - 7 years, most of this rare breed will retire, and replacements are not in training. "Lean Maintenance" can help by providing methods that allow reduced maintenance support and reduced maintenance overhead (often 50% or better) while achieving the maximum permanent reduction of unscheduled downtime, typically;


maintenance equipment 50% reduced mechanical downtime

hydraulic equipment downtime 80% reduced hydraulic systems downtime

industrial equipment uptime 92% reduced electronic systems downtime

Cost of Downtime
So, what is the cost of downtime? Is it something worth eliminating? Different companies calculate or toss different figures; typically $500 per hour for a stand-alone machine, $1,500 - $8,500 per hour for a cell or line of machines, and up to $3,500 per minute ($181,500 per hour) for an entire auto factory line. One practical way to give your "cost of downtime" figures a reality check is to compare them to the price you would pay or do pay when you have to "farm out" a part or assembly because your capacity is temporarily or permanently limited. What do they charge you per hour for this capacity? That's the cost of your downtime. Believe it. Any profit margin they have calculated is quickly offset by your continued need to pay support and regular production personnel who often stand idle. Add your scrap and re-work costs to this, and you will see the true hourly cost of downtime.

 

(Manually add your costs as calculated here.)

Cost of Scrapped Parts $ _______
+ Other Error Costs $ _______
+ Cost of Hourly Downtime $ _______
Sub Total x Hours of Downtime Hours$ ______ X ______Hours
TOTAL COST OF DOWNTIME $ _______

Cost of Scraped Parts + Error Cost + Hourly Cost of DT x DT Hrs. = $__________.____

 

 

Only after you have a firm grasp on your cost of downtime can you calculate the importance and impact Lean Maintenance methods can provide in terms of increased profits, decreased cost of goods sold, and increased market share.
 
In Lean Manufacturing, the cost of a single machine going down for maintenance is multiplied by the number of machines in that cell. With no parts in inventory, a single machine going down results in no parts shipped. Broken delivery schedules cannot be made up if the following parts are made "just in time." It's not only lost sales but also reduced integrity and less satisfied customers, which can result in long-term loss of sales revenue. Downtime then results in a higher cost of goods sold, reducing the ability to expand or maintain sales and business volume.

 

Lean Maintenance - Methodology
The key objective of Lean Maintenance is to give your company the near 100% equipment uptime and reliability it demands while cutting your maintenance expense, often by 50% or more. This is done by systematically surveying or analyzing each machine and control system to determine which primary stresses are affecting each machine over time and laying out a scheme to protect each machine, computer, or control system from the stresses to which it is subject. This certainly includes but goes far beyond the maintenance manual's regular oil change, filter change, and other PM procedures.

 

You must first understand the three categories of downtime:

  1. Downtime from Operator or Programmer Error
  2. Downtime from inadequate PM procedure or performance
  3. Downtime from chronic wear & stress to circuit boards, hydraulic components and other system components.

 

Stresses such as: A. Heat B. Vibration C. Oxidation & Corrosion D. Dirt build-up E. Electrical voltage transients and current surges F. Hydraulic contaminations of dirt, water & acids, etc.

 

Six Sigma, ISO-9000, and TPM books and strategies often cover the first two issues (above), yet they frequently get passed over. "Lean Maintenance" stresses the importance of all three (above) and focuses on the third. "It's like preventing fire hazard," You can have fuel stored or flowing anywhere, but do away with oxygen and heat, and you cannot have a fire. Similarly, if you do away with the chronic stresses that cause 'maintenance fires,' then you cannot have maintenance malfunctions, errors, failures, re-work, scrap, and downtime. The beautiful thing about this method is that it's all "one-time installation" of protective devices to produce ongoing savings. It keeps your product flow, personnel, procedures, operations, and policies the same. Yet, you can reclaim older or less reliable systems to near 100% uptime." You might call this Kaizen for maintenance reliability or how to jump from "Four Sigma" to "Six Sigma."

 

Six Sigma, D.M.A.I.C. - Steps to implement Lean Maintenance

Define the problem:
Unscheduled equipment malfunctions and the resulting rework, scrap parts, downtime and lost production.

 

Why is this a problem? Nowadays machines and computers do all our work. If you don't believe it, unplug all your computers and machines for two or three days and see how much product goes out the back door. Watch the 99% decrease in information or services provided. We must realize that machines and computers are productive company employees. The machines have just as many employees as the humans. Each is paid a per-hour wage based on their value to the company's products and services. Usually, the wages of machines are much higher than those of humans. The company loses profits when it takes a break, makes a mistake, or takes a day off.

 

To state the problem reminds me of a plaque that used to hang in my mother's kitchen, which read, "When Momma ain't happy, ain't no one happy." Maybe we should hang a plaque in the company office that reads, "When machines ain't runnin', ain't nothin' gettin' done!" That's the problem.

 

Monitor & Measure the problem:
Monitor your downtime and measure or calculate its cost (see above).

Suppose you have a CMMS (computer maintenance management system) or a good purchase order and work order system. In that case, we can estimate the potential savings and increased profits from addressing this "problem."

 

Measure and report the following (from the past year)

  1. How many "work orders" or "tickets" for maintenance assistance on unscheduled downtime have you had in the past few months and the past year?
  2. How many hours of unscheduled downtime are from your CMMS or "work orders?" How many maintenance hours are done in-house or by contracted support personnel? How many electrical, hydraulic, mechanical?
  3. From your "purchase orders," how many dollars are needed for equipment repair?
  4. How many dollars are spent on electronic module repair (in-house or outsourced)?
  5. How many dollars are spent on hydraulic module repairs (in-house or outsourced)? 
  6. How many dollars are spent on hydraulic fluid?
  7. How many dollars are spent on hydraulic oil disposal?
  8. How many hydraulic systems?
  9. How many machines or computer-controlled systems are employed here?
  10. Where are the most critical areas or departments needing equipment reliability? (Critical Path Machines)?
  11. What is your average "cost per hour" for equipment downtime?
  12. Multiply this hourly "cost of downtime" by the total downtime hours in #1 & #2 above.


 

If you had eliminated 70% - 92% of #12, is it a number worth your attention?

Is it worth the Companies attention?

Analyze how to solve or eliminate the problem:
Your maintenance engineer, or an experienced consultant or contract engineer, should analyze and identify, for each computer, each machine, and each control system, how to, in the most cost-effective way, protect or harden the equipment from the above stresses. Have them write a report detailing, machine by machine or system by system, the exact means to safeguard from these stresses (as each may apply), giving protective device model numbers, connection points, installation instructions, and costs for each and a total cost summary. The investment needed can then be justified against increased uptime benefits, reduced maintenance labor and repair parts costs, and increased profits from item #12 in the above measurement section.

 

Then Install and Implement
Installation instructions from above should be specific enough that your maintenance personnel can easily and quickly install the needed protective devices, methods, or changes.

 

Controlling the project
Controlling Lean Maintenance in the future should require little to no effort. Steps taken to avoid hydraulic system malfunctions and downtime can reduce by 90% current labor for hydraulic system PM and scheduled downtime while prolonging machine tool life. Most other methods are single-step protective methods that require no future monitoring or PM labor effort.

 

Conclusion
"Lean Maintenance" is equipment reliability focused and reduces the need for maintenance troubleshooting and repairs. Lean Maintenance comes from hardening equipment from the real causes of most equipment downtime -- not just fighting symptoms. Any maintenance engineer or manager can begin Lean Maintenance by protecting automation, electronics, hydraulics, and computer-controlled equipment from the root causes of malfunctions, failures, and downtime-chronic stress discussed above. Circuit board failures, hydraulic system failures, and other malfunctions are only symptoms, not the underlying cause of unscheduled equipment downtime.

 

Author:
Howard C. Cooper


Learn how to avoid Lean Manufacturing Failures. <--SEE


Linkedin Join 4600+ other professionals who follow us on LinkedIn.
Youtube Please subscribe while on Youtube. 35.3K+ subscribers learn from our hundreds of educational videos.
Twitter 3800+ followers keep up to date on our Twitter feed. Won't you join them?
Facebook Over 3000 friends like our Facebook feed, which you may want to follow also.
Pinterest Over 4000 followers find interesting pictures on our 74 Pinterest channels, you may too.